26 June 2008 Since our last visit the spray-foam insulation has been carried out, the wiring loom installed and the fitting of the bulkheads and lining out has commenced.
This picture was taken by Maria just before the spray-foaming was done....
....and this just after!
With the spray-foaming complete and the wiring loom installed the lining out can start.
The bedroom/galley bulkheads are positioned.
Our bathroom takes shape!
The first of the ash side panels go in.
Ian is cutting out the ash panel for the galley houdini. Meanwhile, Chris is checking on the dog!
Our water tank - we have calculated to hold 136 gallons. Paul is scratching his head as to how to connect the supply pipe to the filler (top left), as Reeves have for some reason had this welded in a very awkward postion/angle.
Work in progress on changes to the the fuel filler & cap - we mentioned in an earlier posting that we might have something done to the one fitted by Reeves!
During the visit our hob, fridge & shower were delivered!